Simon Family Tower at Riley Children's Hospital: An IPD Success

North Mechanical is proud to have been a part of the construction team that used the collaborative project delivery method known as Integrated Project Delivery (IPD) to successfully complete the Simon Family Tower project at Indiana University Health's Riley Hospital for Children in Indianapolis. As a part of this team, North Mechanical worked to design and build this 10 story, 360,000 square-foot inpatient building with a goal of reducing both first-time construction costs and facility lifecycle costs. In the end, use of the IPD delivery method allowed the team to reduce waste, improve energy efficiency, save money, and help IU Health improve staff and patient satisfaction. The Riley Hospit

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Twitter Basic Square
  • Facebook Basic Square
  • Grey Twitter Icon
  • Grey Facebook Icon
LOCATIONS

Bloomington

8768 N. Wayport Road

Bloomington, IN 47404
Direct: (812) 825-1762

 

Indianapolis
2627 North Emerson Ave
Indianapolis, Indiana 46218
Direct: (317) 610-2627
Fax: (317) 610-2638

Lafayette
3313 Imperial Parkway

Lafayette, IN 47909

Direct: (765) 588-6719

Fax: (765) 357-8910

Richmond

610 NW 2nd S

Richmond, IN 47374

Direct: (765) 966-0541

Fax: (765) 966-0439

Toll Free: (800) 522-0869

© 2018 m2 Performance Strategies